2025 A10 CX Dataset and Round Robin: Difference between revisions
From Engineered Residual Stress Implementation (ERSI)
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 6: | Line 6: | ||
|- | |- | ||
|'''Data that is made available:''' | |'''Data that is made available:''' | ||
* | *https://residualstress.org/images/b/bd/A-10_Cx_Dataset_-_ERSI_Blind_Predictions_r2vf.pptx | ||
*https://residualstress.org/images/a/a7/A-10_Cx_Dataset_-_ERSI_Blind_Predictions_Phase_II_r0vf.pptx | |||
* | |||
|} | |} | ||
Latest revision as of 01:04, 21 July 2026
| Point of Contact: Bob Pilarczyk |
| Description: •The A-10 program is transitioning toward using residual stresses from cold expansion directly in damage tolerance analyses. A test program was developed to target and isolate the load history and residual stress effects for Cx holes. Fatigue tests include baseline non-Cx and Cx holes, constant amplitude and spectrum loading, and are complimented with residual stress measurements for each condition. |
| Data that is made available: |